Checkoff Sheet MS-2014-01033.tif 2009 INTERNATIONAL RESIDENTIAL CO
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008 �
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this. reroofing fob. q
Property Address: IJ J
Contractor or Homeowner (if self) : m G
Permit #: MS- 2014-
Installation Date:
YEA NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements 'of the .building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are
capable of supporting the roof covering system and the material and equipment loads
that.will be encountered during installation of the roof covering* system. 1 (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 1907.3 `
❑ DID-NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were' not reinstalled if rusted. (R907.5)
i
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed ' in accordance •
with approved manufacturer's installation instructions. Metal flashing to which
'tuminous materials are to be adhered shall be primed prior to installation. (11907.6)
f
Sig a ure f r' ary Installer Dat
Sig ature of ermit Holder Date