Loading...
Checkoff Sheet MS-2014-01033.tif 2009 INTERNATIONAL RESIDENTIAL CO CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 � Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this. reroofing fob. q Property Address: IJ J Contractor or Homeowner (if self) : m G Permit #: MS- 2014- Installation Date: YEA NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the .building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are capable of supporting the roof covering system and the material and equipment loads that.will be encountered during installation of the roof covering* system. 1 (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 1907.3 ` ❑ DID-NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were' not reinstalled if rusted. (R907.5) i ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed ' in accordance • with approved manufacturer's installation instructions. Metal flashing to which 'tuminous materials are to be adhered shall be primed prior to installation. (11907.6) f Sig a ure f r' ary Installer Dat Sig ature of ermit Holder Date