Checkoff Sheet MS-2014-03218.tif 11/04/2014 08:37 FAX 4025332173 IA0031003
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR I
I
REROOFING T
Return to Blair City Hall prior to Final Inspection
218 S 168 h Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
interfere with reroofing work, please indicate compliance with the following requirements
followina this reroofing job.
Property Address:
Contractor or Homeowner (if self). cc f\ S? f1 c
Permit #: MS- 2014-
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (14907.1)
LP ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inche§ in the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPON NT$ ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (14907.2)
EXISTING COVERING WAS.REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED. MgJAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
I
FWIJING INSTALLED PROPERLY; shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
l (lull q
Sign, ature of Priffyary In a er Date
Signature of Permit Holder Date