Loading...
Checkoff Sheet MS-2014-03142.tif 11/04/2014 48:36 FAX 4025332173 10001/003 2 RN"'ATIO'NAL RESID'ENTIAL CODE LAIR s TV tun to Blair City II r r o = I SP C 218 B 1 6 'h S tfeet F E " 13et3 ` used by the Infeasibility to perform detailed Inspections which would not Ming work, please Indicate compliance with the following requirements followi fifili- &W Ping job. J Property Address:�`- Contractor or Homeowner (if self) : Permit #: MS- 2014- /> - Installation Gate: /1� l?_2 �_ t q ES NO our The materials and methods of application used for recovering or replacing the ex isting roof covering comply with the requirements of building code, .(11907.1) SCE PROTECTION INSTALLED !fin ice barrier that consists of at least two layers of underlayment or of a seif- adhering polymer modified bitumen shoet was Installed and extends at least from the eave's edge to a paint at least 24 Inches inside the exterlor wall line of the building. (8905.2.7.1) I :STRUCTURAL COMPONENTS ARE SQUI The structural'roof components are capable of supporting the roof covering system and the material and egiJ.ipment loads that will be encountered during installatloh of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 CHID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain ou #let's, collars or metal counter filashing were not reinstalled if rusted. (14907.5) FLASH INSTALLED PROPER!Y: Flashing shall be reconstructed in accordance with approved manufacturer's Installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed pr €or to Installation. (R907.6) Signature of Primary I s alter Date Signature of Permit Holder Date oP.o 7-7, 218 South 16th Street • Blair, Nebraska 68008 • 402 - 426 -4191 • Fax 402 -426 -4195 E -mail cityofblair @ci.blair.ne,us ­