Loading...
Checkoff Sheet MS-2014-02756.tif i 2009 INTERNATIONAL RESIDENTIAL CO CITY OF BLAIR REROOFING CHECKOFF SHE R eturn to Blair City Hall prior to Final Inspection 21 S 16 S treet, B lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections whi hwould not interfere with reroofing work, please indicate compliance with the following requi rents following this reroofing job. Property Address: Contractor or Homeowner (if self) : i �40r&Aa (Z"1 4 } s, d am. ( C Permit #: °2014 -1)a Installation bate:_ YES NO The materials and methods of application used for recovering or replacing the Apting roof covering comply with the requirements of the building code. (R907.1) L�J ICE PROTECTION INSTALLED An ice barrier that consists of at least two la rs of underlayment or of a self - adhering polymer modified bitumen sheet was install d and extends at least from the eave's edge to a point at least 24 inches inside the e nor wall line ofthe building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof componen are capable of supporting the roof covering system and the material and equipme bads that will be encountered during installation of the roof covering system. (R907. )' EXISTING COVERING WAS REMOVED: Existing roof covering was remov for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, meta edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. ( 117.5) j FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in acc dunce with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R 07.6) Signature of Primary Installer Date Signature of Permit Holder Date - -- i i I I I I i i i