Loading...
Checkoff Sheet MS-2014-02509.tif 2009 INTERNATIONAL RESIDENTIAL CO E CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final Inspection 210 S 16 { " Street, Blair, NE 66006 Because of limitations caused by the infeasibility to perform detailed inspections whi would not interfere with reroofing work, please indicate compliance with the following requi vents following this reroofing job. Property Address: Contractor or Homeowner (if self) : RLL ), i f S) d m Z L I Permit #: - 2014 - s) !S c) ! Installation Date:j i YES NO The materials and methods of application used for recovering or replacing the xsting roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION L l STA consists f at leas o INSTALL An ice barrier that o t two lalkrs of underlayment or of a self - adhering polymer modified bitumen sheet was instal and extends at le ast from the eave's edge to a point at least 24 inches inside the e error wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof componen are capable of supporting the roof covering system and the material and equipme Dads that will be Encountered during installation of the roof covering system. (R907.) EXISTING COVERING WAS REMOVED: Existing roof covering was remove Or one of the reasons required by section R907.3 DID NOT U RUSTED METAL OR FLASHING: Existing vent flashing, meta edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. ( 037.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in acc dance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R 037.6) Signature of Primary Installer Date Signature of Permit Holder Date r