Checkoff Sheet MS-2014-02253.tif r
2009 INTERNATIONAL RESID-ENT1 CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET,
Return to i t t pi Hall, p rior F ina l Inspec
1 �tr, t, l ir, '
Because of limitations caused by the infeasibility to perform detailed Inspp4tIgns which would �
not interfere with reroofing work, please indicate compliance with the following requirements
folldwin this reroofing john
Property Address: h t. I Uo Ss 4r:
Contractor or Homeowner (if self #d1hr
Permit #a - vz ,) 3 _
i
Installation Datb: 6
`ES N
The materials and methods or application used for recovering or rep the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLE ® ; An ice barrier that consists of at least two layers of
underlayment or of a self polyme modified bitumen sheet was installed and
extends at least from the eave's edge to a paint at-least 24 inches inside the exterior
wall line of the wilding. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE -SOUND:; The structural* roof components are
capable of supporting the roof covering. system and the material and equipment loads j
that will be encountered during installation of the roof coveringzyste n: (8.907.2)
EXISTING CgVERING WAS REMOVED; Existing roof covering was removed for one
of the reasons rpQIred by section 8907.3
DID NOT USE METAL OR PLASHING: Existing yenf flashing; metal edges,
drain outlets, collars or metal counter - flashing wore not reinstalled if xusted. (R907.5)
FLASHI INSTALLED, PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacfiureet installation instructio Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R
AJ
Signature of Primary Installer Date
sid nature of Permit Holder Date