Checkoff Sheet MS-2014-02241.tif 2009 R1S1DF,.NT1AL CODE
(,'A T' OF BLA R REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
16Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permitm
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof cover comply with the requirement. of the building code, (8907,1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two laye o f
underlaymenl or of a self-adhering polymer modified bitumen sheet was _installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, meta) edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted, (R907.6)
FLASHING INSTALLED PROPERLY, Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (8907,6)
Sig Lure of Primary Installer Dale
P
Sig ure of it Holder