Checkoff Sheet MS-2014-02161.tif 09 INTERNATIONAL RESIDENTIAL COD
CITY OF BLAIR REROOFING CHECKOFF SHEET .
i
Return to Blair .City Hall prior to Final Inspection
218 S 16 Street, Blair, NE' 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this - reroofing job.
Property Address: y-
Contractor or Homeowner (if self)
Permit #: MS- 2014- 021 r-P
Installation Date: '
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements 'of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the e'ave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are
capable of supporting the roof covering. system and the material and equipment loads
thatwill be encountered during installation of the roof covering'system. I (R907.2)
i
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one �
of the reasons required by section R'907.3
❑
DID, NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were" not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature 9 Primary Installer Date
Signature of Permit Holder Date
I
i