Loading...
Checkoff Sheet MS-2014-02161.tif 09 INTERNATIONAL RESIDENTIAL COD CITY OF BLAIR REROOFING CHECKOFF SHEET . i Return to Blair .City Hall prior to Final Inspection 218 S 16 Street, Blair, NE' 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this - reroofing job. Property Address: y- Contractor or Homeowner (if self) Permit #: MS- 2014- 021 r-P Installation Date: ' YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the e'ave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering. system and the material and equipment loads thatwill be encountered during installation of the roof covering'system. I (R907.2) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one � of the reasons required by section R'907.3 ❑ DID, NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were" not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature 9 Primary Installer Date Signature of Permit Holder Date I i