Loading...
Checkoff Sheet MS-2014-01947.tif 2009 INTERNATIONAL RESIDENTIAL CODE CHECKOFF SHEET I, Return to Blair city 'Hall prior to Final Inspection 218 S 16th Street, Blair, NE 60008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements; following this reroofing job. Permit #: <� L( �q Installation Date. �..� i YES NO [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building coda. (8907.1) ICE PRO TECTION INSTALLED: An ice barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen sheet was installed and extends a least from the eave's edge to a point at least 24 inches inslda the exterior; wall line of the building. (8905.2.7.1) STRUCT COMPONENTS ARE SOUND: The structural roof components are capable (if supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ® EXISTIN COVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section R907.3 NO RUS TED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing ware not reinstalled if rusted. {8907.5) FLASHI INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Date ign atura of Primary Installer Date SignaPermit molder i i