Checkoff Sheet MS-2014-01642.tif i
I EE
Ret 2 91 1,NTERNAT,,10 G D
00 0 E
CITY OF IRREROOFING, C, HE
r, - -
to
't ra t, 131AIr NE6 so
Because of limitations caused oy the infeasi iii tra perfr rn� detailed nspeo runs which -would
not Interfere with rero pleaso indisate domplianoe with ho .011'0 ri g e,441remen s
following this - reroofing job,.
property Address: 00 Vic° &l 4 64r.
Contractor or Homeowner (if
Pe it + 1t
In i AA 1ation D -fe -
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering`_com
ply with the requirements of the building cede. �R907,'1}
i
ICE PROTECTION INSTALLED An ice ;barrier that consists of at least two layers of
underlayment or of a self adhering polym6r modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 Inches inside the exterior
wall line of the building, (R905.2.7.1)
STRUCTURALPt7lEI1ITS ARE SCIUDp The structural roof components ere
capable of supporting the'roof covering system and the material and equipment loads
that will been during installation of the roof covering system: {8907.2}
EXISTING GOVERINGWAS REMOVED: Existing roof covering was removed for one
of the reasons, re9,,iri cd by section k907-3
DID NOT :USE flUSTED METAL OR FLASHING: Existing gent flashing; metal ;edges,
drain outlets, collars or metal counter flashing were reinstalled if rusted. (8907.5)
FLASHING IN ST` LLED PR PERRY: Flashing shall be reconstructed In apcordance
with approved manufacturer's installation Instructions. Metal f lashing 10 - whiph
bituminous materials are to e adhered shall be primed prior to Installation, (8307.6)
i
Signature of Primary Installer Date
Signature of Permit Holder Date ` -