Checkoff Sheet MS-2014-01436.tif i
10/31/2014 06:13 7790112 GOEDEN CONSTRUCTION PAGE 01
SHEET 2009"1 MYTERNATO""N"AL K"ESIDENTIAL CODE
CITY OF 13LAIR REROOFING CHECKOFO
R eturn to B lairCity Wall p rior to Final Inspection
18 8 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to perform detailed Inapdations which would
gol Interfere with reroofing work, please Indicate compliance with the following requirements
follming this- reroofing Jab.
Property Address:
Contractor or Homeowner (if self)
Permit #: S- 2014- Q
Installation DaW
YES . NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requlrements'of the building code. (8907.'1)
i
icE P OTE N INSTALLED: An ice barrier that consists of at least two layers of
underla►yment or of a self - a dhering polymer modified bitumen sheet was installed and
extends -t Igast from tl ie eava'.s edge to a paint at least ? inches :inside the exterior
wall line of the building. (R905.2.7.1)
S ILifiTi1 L qQ_M N� E -SOUND• The structu a ' a
r 1 r •f components are
capable of supporting the roof covering system and they material and equipment loads
that will be encountbred during Installation of the roof covering'ayatem. (8907,2)
EXISTING C RING WAS REMOVED; Existing roof covering was removed for one
of the reasons required by section 11907.3 `
rJID NOT lJ E RUST M ETAL OR F LASHIN - G • Lxlsting vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (11007.5)
FWHING W§TALLED PROPERLY: Flashing shall be reconstructed In accordance
i
with approved manufacturer's Installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed priarto Installation. (R907.6) 0/3
Slgnatu of Primary Installer pate
Signature 0 ermlt Holder Date
' I
i