Checkoff Sheet MS-2014-01290.tif ,
2009 INTERNATIO. NAIL. CH ECKQ
RESIDE
eturn lair ti y all prior lo Final Inspection
24 8 S �16 Street, Blair, ;N ' 68008
Because of limitations caused,by;the infeaslbility lo` perf ®rm detailed inspectlor�s which would
not interfere with reroofing work please indicate compliance with the foi lowfng requirements
following owing this reroofing job,
Property Address; M1 dres�fL "fir.
Contractor or Homeowner (if self)
Permit #. =2 '1 - 0-ZIA
i
Installation'DA. . 7- ?t=t i
YES NO
The materials and methods of application used forrecovering or replacing the existing
roof covering comply with the requirements of the .building code::(R907.1)
ICE PRO'J'ECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a.selfi adhering polymer modified bitumen sheet was installed and
.extends at least from the eave's,edge to a point at.least 24 inches inside the exterior',
wall line of the building. ,(Rg05.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND., The structural roof c omponents are
capable of suO.porl:ing the roof covering. system and the material an equ pmenfi loads
that, will be en" ncountered during installation of the roof, covering; system. (8907.2)
EXISTING COVERING WAS REMOVED. Existing roof covering vsraS removed for one
of the re "ons ecf red by section 8907.3
.. „
l ® DID NOT USE RUSTE D , METALOR FLASHING. Existing ventflashing; metal edges,
drain outlets,, collars or metal counter - flashing were not ' lnstalied if rusted. (8907.5)
FLAS' ING INSTALLED PROPERLY. Fieshing shall be reconstr=ucted in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
i
Sig ature of Primary Installer Date
Signature of Permit Holder Date