Loading...
Checkoff Sheet MS-2014-00425.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF LI R REROOFING Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing job. Property Address: /Z `/ S Contractor or Homeowner (if self) Permit #: MS -2014- b OVIS Installation Date: 6/ -Z ,/ YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) LL ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least'from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural: roof components are capable of supporting the roof covering, system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 i DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) /® L //I Signature of Pr mary Installer Date SignatLVe of Permit Holder Date