Checkoff Sheet MS-2014-00425.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF LI R REROOFING
Return to Blair City Hall prior to Final Inspection
218 S 16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this- reroofing job.
Property Address: /Z `/ S
Contractor or Homeowner (if self)
Permit #: MS -2014- b OVIS
Installation Date: 6/ -Z ,/
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
LL
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least'from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural: roof components are
capable of supporting the roof covering, system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
i
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter- flashing were reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
/® L //I
Signature of Pr mary Installer Date
SignatLVe of Permit Holder Date