Checkoff Sheet MS-2014-02946.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair Ct Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements j
followinq this. reroofing job.
I
Property Address: _ �� /� �(, 44, ,
Contractor or Homeowner (if seI : A Sf )e1(\
fl �
Permit #: MS- 2014 -
Installation Date: _� f �f
YES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements 'of the .building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE •SOUND: The structural' roof components are
capable of supporting the roof covering, system and the material and equipment loads
that will be encountered during installation of the roof covering system.
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section F 907.3 `
❑
DID, NOT USE RUSTED METAL OR FLASHING: Existing veni flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6) j
1C 30
Signa ure o rimary Installer Date
Signature of Permit Holder Date