Loading...
Checkoff Sheet MS-2014-02946.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair Ct Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements j followinq this. reroofing job. I Property Address: _ �� /� �(, 44, , Contractor or Homeowner (if seI : A Sf )e1(\ fl � Permit #: MS- 2014 - Installation Date: _� f �f YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements 'of the .building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE •SOUND: The structural' roof components are capable of supporting the roof covering, system and the material and equipment loads that will be encountered during installation of the roof covering system. ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section F 907.3 ` ❑ DID, NOT USE RUSTED METAL OR FLASHING: Existing veni flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) j 1C 30 Signa ure o rimary Installer Date Signature of Permit Holder Date