Loading...
Checkoff Sheet MS-2014-01676.tif 10/30/2014 15:37 4025545309 HSCCNT PAGE 01/01 RESIDENT CITY OF BLA IR REROOFING CHECKOFF 1 Return to Blair Cit Hall prior to Final Inspection 218 �1 Street, Blair, N 68008 Because of limitations caused by the-infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job, e Pro Address: Property m Contractor or Homeowner (if self) i Permit #. M - 2014- :Ili instailation Date-, YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INS ALLEG1 An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to a paint at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) - TRUCTURAL COMPONENTS ARE Sg ND; The structural root' components are � capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERi:NG WAS REMOVED: Existing roof covering was removed for one _ ... -ofthe reasans_requi�e l...by section 8907.3_ I I DID NO use RUSTED METAi_. OR F LASHING: Existi vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) 0 FLASHING INSTALLED PROPiE;RLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which � bituminous materials are to be adhered shall be primed prior to installation. (8907,6) 1 I sign re �N a Installer pate i *ignature of P rmit H er pate —