Loading...
Checkoff Sheet MS-2014-01057.tif _ I tt t tit t t t t t t,t I CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspectisin j 18 S 161h Street, Blair, NE 08000 Because of limitations caused by the infeasibility' to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Property Address: 2264 Cedar Circle Blair NE 68008 Contractor or Homeowner (If self) ; United Services of America, Inc. (date of notice letter 10/20/2014) Permit #: MS -2014- 01057 Installation Date: Re -Roof Completion Date: 7/18/2014 YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's;edge to a point: at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are r capable of supporting the roof. covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING. COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR PLASHING. Existing vent` lashing, metal edges, drain outlets, collars or metal counter - flashing were riot `reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) 10/30/14 Signa.ure of Primary Installer Gate A&I, Ah /i a l 1- 10/30/14 S€gna re' of Permit Holder Gate