Loading...
Checkoff Sheet MS-2014-00995.tif INTERN RESIDEN CODE CITY OF BLAIR REROOFING CHECKOFF SHEET. Return to Blair City Hall prior to Final Inspection 2'18 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would Lot interfere with reroofing work, please indicate compliance with the following requirements following this-reroofing job. Property Address: _ Wo Contractor or Homeowner (if self) Permit #: MS- 2014- 00 q Installation Date: i YES - NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements'of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and j extends at least from the e'ave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are capable of supporting the roof covering. system and the material and equipment loads thatwill be encountered during installation of the roof covering'system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R'907.3 ` DID, NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance i with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signatur of Prima Installer Date Signature of Permit Holder Date