Checkoff Sheet MS-2014-00995.tif INTERN RESIDEN CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET.
Return to Blair City Hall prior to Final Inspection
2'18 S '16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
Lot interfere with reroofing work, please indicate compliance with the following requirements
following this-reroofing job.
Property Address: _ Wo
Contractor or Homeowner (if self)
Permit #: MS- 2014- 00 q
Installation Date:
i
YES - NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements'of the building code. (R907.1)
❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and j
extends at least from the e'ave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE -SOUND: The structural'roof components are
capable of supporting the roof covering. system and the material and equipment loads
thatwill be encountered during installation of the roof covering'system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R'907.3 `
DID, NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
i
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signatur of Prima Installer Date
Signature of Permit Holder Date