Loading...
Checkoff Sheet MS-2014-00830.tif INTERNA RES IDENTIAL CODE CI TY OF BLAIR REROOFING CHECKO SHEET Return to Blair City Hall prior to f=inal Inspection 218 S 16 th Street, Blair, NE 68008 because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. o r Permit #: !�S - gyp l �l - �3� 1 b �C► �a Installation Date: � i YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) -� Date Signature of Primary Installer A A 0 Date Signature o e mi Holder I I