Loading...
Checkoff Sheet MS-2014-02634.tif i '2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to l it city all prior to Final inspection 218 S je Street, Blair, NE 68008 Because of lirmitations caused by the Infeasibility to perform detailed i n spections which wo ld not interfere with reroofing work, please indicate compliance wth the following q i foil Ing this reroofing job. Permit #: installation Cate: i I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION - INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was i_ nstalled and extends at least from the eaves edae to a point at l 24 inches inside the exterior wall line of the building. (Rgub -z -f STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are t capable of supporting the roof covering system and the material and equipment loads . {11907.2) that will be encountered during installation of the roof covering system EXISTING COVERING' WAS REMOVED: Existing roof covering was removed for one Of the reasons required by section 11907.3 i NO RUSTED METAL OR FI- COSHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.5) FLASHING INSTALLED P ,oPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) l S Prim ry i a ler ate — 4at g e Signature of Permi Hold i i i