Checkoff Sheet MS-2014-02926.tif i
j
10- 28 -'14 12,91 FROM- Absolute Customs T -220 P0901100 05 F -193
2009INTERNATIONAL RESIDENTIAL CODE
CITY O F BLAIR REROOFING H FF SHEEN"
Return to Bair City ball prior to Final inspection :
218S j 6 th S treet, Blair, NE 69008
i3ecause of limitations caused by the infeasibility to perform detailod inspections which would
0 interfere with reroofing work, please indicate compliance Mth the fallovurr119 requirements
following this reroofing job. nn
Permit 9: ' .YIAAf4 Y
,A Lo bi
In stallat ion Date:
YES No
The materials and methods of application used for reccNering or replacing the ex ;sting
roof covering comply with the requirements of the building code. (11947.1)
CE P&O ECT10 M IN ALIT []; An ice barrier thatconsists of at feast two layers of
underlayment or of a self-adhering polymer modfsd bitumen ahsst was nsta ed and
ends at le t fron the eaVe`s a to . polo{ at least 24 in he ' side the exterior
wall line of the building, (R995.2.7.1)
S°l RUG U&AL _C po lrMIS ARE iOUN The structural 170 components are
capable of supporting the roof cornering aystSM and the material and equipment loads
,.., that will be encountered during installation of the roof covering syst6m. (1;987.2)
®
EXISTIN COVERIN AS Rlrllll ED: Existing roof covering was removed for one
of the reasons required by section R007.3
NO RU ED E'1"P►L GI, FLT Existing vent flashing. metal edges, drain
outlets, collars or metal counter-flashing weref not relnstalled if rusted. (11087.5)
I
LAS NG k1 $'ALI . Q RRC1Fln !.`iC; Flashing shall be reconstructed in accordance
with approved manufacturer's Installation instruotions. Metal flashing to which j
bliuminous materials are to be adhered small be piimed prior to installation. (R907A 1
l atur of Primary installer ate
Signature o �t t rmit HoldeIr ate
l
I