Checkoff Sheet MS-2014-02836.tif I
10 28 - + 14 12,01 FROM - Absolute Customs T -220 P0005/0005 F -193
2009 INTERNATIONAL RESIDENTIAL, CODE �
CITY OF BLAIR REROOFING CHECKOFF SHEEN'
Return to Blair City Mail prior to Fidel InsPS01013
218 S I (P` Street, Blair, NE 68008
0ecause of. limitations causeci by the infeasibillity to perform do'telled inspeottons which would
not interfere with reroofing work, please indicate eompligince with the following requirements
following this reroofing job.
Permit ##: , Ns:? 14 "'
Installation Date. _AL
YES NO
The materials and methods of application used for recovering or replacing the wdsting
roof covering comply with the requirements of the building code. (R9O7.1)
jqp pROTEGTt0N ll; g TALLER p n ice barrier that consists of at Ieast two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was install d and
extends at least fro the eaves cad. e to a paint at (ea. a.st 2- 4_, incl.�e side the e Brier
wall line of'the building. (R9O5,2.7.1)
STRUCTURAL + pM.l?QN>" T ARC St�Ul� U: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering systelir. (R947.2)
EXISTING COVERIMG W A51 1 ;Mf VI=D: Existing roof oovering was removed for one
of the reasons required by section 8907.3
M RUgT D IVI �'lAL OR FL .SWIG: Existing vent flasliing, metal edges, drain
outlets, collars or metal counter- f[ashing were not reinstalled if rusted. (R9O7,5)
" LASi-111110 INSTALL>_Q PR ERL.Y: Flashing shall be reconstructed in accordano�
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Il
ignature of Primary installer °
afar ref ermit l°iolder Date
I I