Loading...
Checkoff Sheet MS-2014-02834.tif i 10- 28 -'14 12;01 FROM- Absolute Customs T -220 F0003 {0005 F -193 2009 INTER NATIONAL RES IDENTIAL, CODE C ITY OF BEAD. REROOFING CHECKOFF SHEET Return to Blair C Hall PrIa r tO Ertel inspection ; Eeoguse of 11inifations caused by the infeasibility to perform d®kailed inspections W1110h would Mt interfere with reroofing work, please indicate ca►npllattce Mth the following requiraments following this reroofing selx; Permit 9. 11, i . Installation >rlate� t YES No The materials and methods of application used for recovering or replacing the existing TOO covering comply with the requirements of the building crude, (R907A) 10E l' CtTECTICN INSTAt.L>r13: An ice barrier thatconsists of at least tuvb layers of underiayment or of a self-adhering polymer modified 61tumen sheet was installed and extends at least fr m tho eaye's. edge. a point of lust 24 'tn_ s inside the exterior wall line of the building. (R9052.7.1) aTR'UCTLlpAL CtOtl PQNENTS ARl` S� The structural roof components are capable of Supporting the roof covering system anatha material and equipment loads � that will be encountered during installation crf the root covering system, (8907,2) EXISTIN COVERT G liV S REllttGVED: Exlstingro�af covering was removed for one of the reasons required by section Rg07',3 CJ i [ltl i ►L I- ASHING,' t= xisting vent flashing, metal edges, drain outlets, dollars or metal counter we rE$ net rein talied if rusted. (89 rl IFLA tJlNQ INS ALL�LI ifQ2 RLY: dashing shall be reconstructed in accordance with approved rnanufacturees installation instructions. Metal flashing to whloh biturninous rnateriais are to he adhered sh$Il be palmed prior to inataliatlan. (R9(l7 5) i Sigp Date ate Signature of ermit Holder I