Checkoff Sheet MS-2014-02834.tif i
10- 28 -'14 12;01 FROM- Absolute Customs T -220 F0003 {0005 F -193
2009 INTER NATIONAL RES IDENTIAL, CODE
C ITY OF BEAD. REROOFING CHECKOFF SHEET
Return to Blair C Hall PrIa r tO Ertel inspection ;
Eeoguse of 11inifations caused by the infeasibility to perform d®kailed inspections W1110h would
Mt interfere with reroofing work, please indicate ca►npllattce Mth the following requiraments
following this reroofing selx;
Permit 9.
11, i
.
Installation >rlate�
t
YES No
The materials and methods of application used for recovering or replacing the existing
TOO covering comply with the requirements of the building crude, (R907A)
10E l' CtTECTICN INSTAt.L>r13: An ice barrier thatconsists of at least tuvb layers of
underiayment or of a self-adhering polymer modified 61tumen sheet was installed and
extends at least fr m tho eaye's. edge. a point of lust 24 'tn_ s inside the exterior
wall line of the building. (R9052.7.1)
aTR'UCTLlpAL CtOtl PQNENTS ARl` S� The structural roof components are
capable of Supporting the roof covering system anatha material and equipment loads �
that will be encountered during installation crf the root covering system, (8907,2)
EXISTIN COVERT G liV S REllttGVED: Exlstingro�af covering was removed for one
of the reasons required by section Rg07',3
CJ i [ltl i ►L I- ASHING,' t= xisting vent flashing, metal edges, drain
outlets, dollars or metal counter we rE$ net rein talied if rusted. (89
rl IFLA tJlNQ INS ALL�LI ifQ2 RLY: dashing shall be reconstructed in accordance
with approved rnanufacturees installation instructions. Metal flashing to whloh
biturninous rnateriais are to he adhered sh$Il be palmed prior to inataliatlan. (R9(l7 5) i
Sigp Date
ate
Signature of ermit Holder
I