Checkoff Sheet MS-2014-02833.tif i
i
10- 28 -'14 12,01 FROM - Absolute Customs T -220 P0002/0005 F -193
2`20 INTERNATIONAL RES IDENTIAL CODE
CITE' OF B LAIR REROOFING CHCCKOFF SHEET
Return to Blair City Hall prior to Fidel inspection
18 3 1 e Street, Blai>r ME 6 5008
13e0ause of limitations caused by the infeasibility to perforno eatailsd inspections which would
111terfrare with reroofing work, Please indloate onrnPllancc Vilth the followirig rsquirerrients
following this reroofing job.
Permit ff 11A C Y 14
Iristallation Date: W)4_
YES No
The materials and methods Of Vl?llcatiotl used for recovering or replacing the existrng
roof covering comply with the requirsments of the building cede. (Pt907.1)
of
ICE PROTECTION INST An ice barrier thatcc nsists of at least two layers n
underlayment or of a self- adhering Polymer modified bitumen sheet was nstalled an
extends at lust from t he eave'; edge cl_e to a point at least 24 'nc' s lr s�tde. the exterior
wall line of the building. (R905•2.7.1)
STRUCTURAL. GC?IV pgggNjg � �:_ , fhe structural roof components are
capable of sriPPOrting the roof covering system andthe material and equipment loads
that will be ertcountc red during installation of the rmf covering system. (8947.2)
( ® 7i1 T[l1it C 3Vl =EtIN W S REMOVE Existing roof covering was removed for one
of the reasons required by seclon 8907,3
i
t�{lt gaU TEES M>`'1`P.L C'LASI-IIkLo Fxisfing veldt flashing, metal edges. drain
outlets, collars or metal counter - flashing wer6 not reinstalled if rusted • (R947.
FLANN 4lil1 a ill �'I�LLEl7 f RO 1 CR ` . Flashing shall be reconstructed to amordanoe
with approved manufacturer's installation instructions. metal flashing to which
bituminous materials are to be adhered shall be primed prior to installatlon. (8007.4) j
S
81 ature rat Primary Installar date
T 10
Sign Lure of armit Holder Date
I