Loading...
Checkoff Sheet MS-2014-02714.tif i 2009 INTERNATIONAL, ELI= IDENTIAL CODE C.�ITY OF SLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would j not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: I i YES NO Q The materials and methods of application used for recovering or replacing the existing j roof covering comply with the requirements of the building code. (8907.1) I ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from !he eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 l I ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which (, bituminous materials are to be adhered shall be primed prior to installation. (R907.6) LY j Sig lure of Primary Installer Date // I -10 d- Sig ure of P ii Holder ate