Loading...
Checkoff Sheet MS-2014-01538.tif ES DENTIAL COD � ao INTER �. , CITY OF REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Final inspection 21 8 S '16 street,. Blair, NB 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please dicate compliance w ith the following requirements followin this reroofing fob. .20 (p L--a r &m t) . Permit #: installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a point at least 2 inches inside the exterior wall line of the building. (R905.2.7.1) / I STRUCTURAL COMPONENTS ARE sou The structural roof components are ` the roof covering system and the material and equipment loads capable of supporting that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED. Existing roof'covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) PLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in aordance wi approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) R � ma Instal / 6a Signature of Primary -- / c -g Signatu ermit = Holder Dat