Checkoff Sheet MS-2014-00796.tif INTERNA TIONAL RESIDENTI
CITY OF BLAIR RER60FING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
21 8 s 'i 6th street,. Blair, NB 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, lease ind`�ate compliance with the following requiremen s
following this reroofing job. ��' �7l I I6 0j r .
Permit:
Installation Date: �22 �0
YES NO
( The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
[� iCE PRo iou INSTALLED: An ice barrier that consists of at least tw ta led and
underlayment or of a self-adhering polymer modified bitumen sheet was to
extends at leash from the eave's edge to a point at least 24 inches inside the exterior
wall lime of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and t he Material d equipment loads
that will be encountered during installation of the roof g syst
EXISTING COVERING WAS REMOVED: Existing roof'covering was removed for one
of the reasons required by section R907.3
(� No RUSTED METAL OR FLASHING*, Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
[�. FLASHING INSTALLED PROPERLY: Flashing shall be re constr u c t ed flashing o which acco rdance '
( El with approved manufacturer's installation instructions. Met al g
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signatu of Primary Installer
Date
lC
Signature of Permit Holder Data