Loading...
Checkoff Sheet MS-2014-02494.tif i Oct 22 1412:52p Triton Exteriors Inc,q 763 -684 -1147 p,8 009 INTERNATIONAL RESIDEN CITY OF BLAIR REROOFING CHECKOFF SHEET. Return to Blair Ct Hall prior to Final Inspection 2 18 S '16 i Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this• reroofing job. C Property Address : 1. > > i Contractor or Homeowner (if self) Permit #: MS-- 2014 t-- L Installation Date: s N o ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (11907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge_ to a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1)- ❑ ST RUC COMPONENTS ARE -5.0UND: The structural'roof components are capable bf supporting the roof covering. system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED; fisting roof covering was removed for one of the reas©ns required by section 8907.3 ❑ DI© NOT USE RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were• not reinstalled if rusted. (R907.5) ❑ PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date �.. Signature of Permit Holder bate i i