Loading...
Checkoff Sheet MS-2014-01763.tif 763- 684 -1147 p . 2 Oct 22144112:51P - TrriitonExteriorsIno.q ESIDEN CITY OF BLAIR REROOFING CHECKOFF al Ins ection Return to Blair City Hall prior to Fin p M S ie Street, Blair, NE 68005 e of limitations caused by the 'infeasibility to perfor detailed ins ' o wing s i e would Becaus tease indicate complianc not interfere with reroofing work, p foilowin this reroofing job. Propdrty Address: Contractor or Homeowner (If self) . permit #: MS..204_ Q Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the exisfing roof covering comply with the requiremenfis of the building code. (R907.1) laers of ICE PROTECT ION INSTALLED: An ice barrier that onsists omens ee tw�nstalied and underlayment or of a self - adhering polymer mod�fted bit extends at l east frcm the eaves e dge to a'point at least 24 inches inside the exterior wall line of the build►ng. (R905.2.7.1) The t components are ® STRUCTURAL GOCUIPONENTS ARE �S �UN D� and fihe mafieriaf and quipm nt loads apable of susupporting the roof covering m y 8907.2 that will be ericountered during installation of the roof coverin s .stem. ( ) EXl5T1N G Ct3VERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 Q DID NOT USE RUS'i•ED tV(ETAL_OR FLASH(N ere not einst lied h-us (R907�5) drain outlets, collars ar metal counter-flashing w FLASHING INSTALLED PROPERLY: Flashing tions. Metal flashing o which ardance m be reconstructed in ace with approved manufacturers stallatian instnt or to installation. {8907.6) bituminous materials are to be adhered shall be primed pri --___ Q d 3 ate nature of Primary Installer Date Slg a urle of Permit Holder