Checkoff Sheet MS-2014-01763.tif 763- 684 -1147 p . 2
Oct 22144112:51P - TrriitonExteriorsIno.q ESIDEN
CITY OF BLAIR REROOFING CHECKOFF al Ins ection
Return to Blair City Hall prior to Fin p
M S ie Street, Blair, NE 68005
e of limitations caused by the 'infeasibility to perfor detailed ins ' o wing s i e would
Becaus tease indicate complianc
not interfere with reroofing work, p
foilowin this reroofing job.
Propdrty Address:
Contractor or Homeowner (If self) .
permit #: MS..204_ Q
Installation Date:
YES NO
❑ The materials and methods of application used for recovering or replacing the exisfing
roof covering comply with the requiremenfis of the building code. (R907.1) laers of
ICE PROTECT ION INSTALLED: An ice barrier that onsists
omens ee tw�nstalied and
underlayment or of a self - adhering polymer mod�fted bit
extends at l east frcm the eaves e dge to a'point at least 24 inches inside the exterior
wall line of the build►ng. (R905.2.7.1)
The t components are
® STRUCTURAL GOCUIPONENTS ARE �S �UN D� and fihe mafieriaf and quipm nt loads
apable of susupporting the roof covering m y 8907.2
that will be ericountered during installation of the roof coverin s .stem. ( )
EXl5T1N
G Ct3VERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
Q DID NOT USE RUS'i•ED tV(ETAL_OR FLASH(N ere not einst lied h-us (R907�5)
drain outlets, collars ar metal
counter-flashing w
FLASHING INSTALLED PROPERLY: Flashing tions. Metal flashing o which ardance
m be reconstructed in ace
with approved manufacturers stallatian instnt or to installation. {8907.6)
bituminous materials are to be adhered shall be primed pri
--___ Q d 3
ate
nature of Primary Installer
Date
Slg a urle of Permit Holder