Loading...
Checkoff Sheet MS-2014-01548.tif 10/20/2014 MON 9:42 FAX 0004/004 00 R N NA RESIDENTIAL L CITY OF BL REROOFING CHECKOFF SHEET. Return to Blair City Hall prior to Final Inspection 218 S '16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this- reroofing job. A Property Address: � � � AV � Contractor or Homeowner (if self} Permit #: IVIS -2014 ^ I Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) /� ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of / underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural'roof components are capable of supporting the roof covering, system and the material and equipment loads that will be encountered during installation of the roof covering system. .(R907.2) (, �❑ ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 I ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, Train outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sig atu e o P imapj Installer Date Si hatUte of Permit Holder Date