Loading...
Checkoff Sheet MS-2014-00651.tif i 10/20/2014 MON 9:42 FAX 2002/004 INTERNATIONAL RESI L CODE CITY Y LAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S '16 Street, Blair, NE 68008 i Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follo this reroofing job. Property Address: / Contractor or Homeowner (if self} Permit #: MS- 20114- )Gn Installation Date: YE NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 10E PROTECTION INSTALLED An ice barrier that consists of at least two layers of underiayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R906.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural' roof components are capable of supporting the roof covering. system and the material and equipment loads that will be eftountored during installation of the roof covering system. .(R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DiD NOT USE RUSTED METAL. OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were reinstalled if rusted. (R907,5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i re Primary Installer Date S ture- of Permit Holder Date i I