Loading...
Checkoff Sheet MS-2014-02903.tif i 2 009 INTERNATI R SI NI L CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this. reroofing job. i Property Address: 0 D'�� Contractor or Homeowner (if self) : bTw& I Permit #: MS -2014 i Installation Date: c / YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. . (R907. 1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of gp Y underla ment or of a self- adhering polymer modified bitumen sheet was installed and Y extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural' roof components are capable of supporting the roof covering, system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which j bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date ) S na ure of Permit Holder Date I I i