Checkoff Sheet MS-2014-02164.tif i
i
2009 INTERNATIONAL RESIDENTIAL CODE
C
CITY OF BLAIR REROOFING CHECKOFF SHEET
Re turn to lair C ity Hall p rior to final Insp ection
2 18S16 t St reet, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections 'which would
not interfere with reroofing work, please indicate compliance with the following requirements
h2ffowin this reroofing job. j
Permit'
1
Installation Date: _ 11q
i
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTAL.L,ED An ice barrier that consists of at least two layers of �
i
underlayment or of a self: adhering polymer modified bitumen sheet was installed and
extends at least from the eave's 'edge to a point at lust 24 inches inside the exterior
wall line of the building. (R906.2.7.1)
STRLICTLIRAL. COMPONENTS AR.E SOUND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907,2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
' I
NO RUSTED METAL OLZ FLASHING c Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8.907.5) f
k
FLASHING INSTAL.L.ED PROPERLY. Flashing shall be reconstructed in accordance f
with approved manufacturers installation instructions. Metal flashing to which I
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature o PO ary Ins ler b ate
�6 /2.
Sggnature of Per ` Holder Date
i
F