Loading...
1709.tif j i G j i ` . IN AL RESID ENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF S H EE T Return to Blair cfty Hall pri to Final Inspection M S '16 Street, Blair, NE 680 nspections which Because of limitations caused by the infeasibil e liance d wi h r quirements not interfere with reroofing work, please indicate com P following this reroofing job. Permit #: �S Installation Date.: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edq to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) Tc e [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the mainrias stemauR907 2)loads that will be encountered during installation of the roof cover g y ( } EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 (� NO RUSTED METAL OR FLASHING: Existing o rein lashi ,ifinetal rust e dges, d C �k 0 outlets, collars or metal counter - flashing were n [� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) — ?_ fI gnature of Primary Installer Date i nature of Permit Holder Date