Loading...
Checkoff Sheet MS-2014-01508.tif i i 2009 INTERNATIONAL. RESIDENTIAL.: CODE CITY OF t LAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements p ng qurrements following this reroofing job. Permit #>': f qs - r - Aq" 015 Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlaymeni or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) d STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ❑ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which j bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ?d -/y Sig ture of Primary Installer Date Sig ure of Perr6it Holder Date