Loading...
Checkoff Sheet MS-2014-01470.tif J f l c6 Q IT ATI L RES IDENTIAL 2009 CITY of LArR Rs�ooFrNO w cKFF sHEET Return to Blair City Hall prior to Final Inspection 218S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would indicate compliance with the following requirements not interfere with. reroofing work, please followin this reroofing job. Permit #• I e Installation Date: �—-- -- i i YES NO and methods of application used for recovering or replacing the existing The materials roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrie od f ed bitumen sheet was led and nt or of a self - adhering polymer m side the exterior underlayme i extends a least from the eave's e d e to a point at least 24 inches insi wall line of the building. (R905.2.7.1) j STRUCTURAL COMPONENTS ARE roof components are and th SOUND: The str uctural terial and equipment loads capable of supporting the roof covering system that will be encountered during installation of the roof covering system. (R907.2) ® EXISTIN G COVERIG WA S RE NMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 etal edges, ® NO RUSTED METAL OR FLASHING: Existing v nt flas n c if rusted (R907.5) ou collars or metal counter- flashing were n FLASHING INSTALLED PROPERLY: Flashing ttons Metal flashing o which ordance with approved manufacturers installation instru bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Date Sig ur o ri ary Installer Y Date Si re of Permit lder