Checkoff Sheet MS-2014-01470.tif J f l c6 Q
IT ATI L
RES IDENTIAL
2009 CITY of
LArR Rs�ooFrNO w cKFF sHEET
Return to Blair City Hall prior to Final Inspection
218S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
indicate compliance with the following requirements
not interfere with. reroofing work, please
followin this reroofing job.
Permit #•
I
e
Installation Date: �—-- --
i
i
YES NO
and methods of application used for recovering or replacing the existing
The materials
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrie od f ed bitumen sheet was led and
nt or of a self - adhering polymer m side the exterior
underlayme i
extends a least from the eave's e d e to a point at least 24 inches insi
wall line of the building. (R905.2.7.1) j
STRUCTURAL COMPONENTS ARE roof components are
and th
SOUND: The str uctural terial and equipment loads
capable of supporting the roof covering system
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTIN
G COVERIG WA S RE
NMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
etal edges, ® NO RUSTED METAL OR FLASHING: Existing v nt flas n c if rusted (R907.5)
ou collars or metal counter- flashing were n
FLASHING INSTALLED PROPERLY: Flashing ttons Metal flashing o which ordance
with approved manufacturers installation instru
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Sig ur o ri ary Installer
Y
Date
Si re of Permit lder