Loading...
Checkoff Sheet MS-2014-00991.tif i I 10/20/2014 06:22 7790112 GOEDEN CONSTRUCTION PAGE 01 IN TERNATI ONAL C ITY OF BLAIR REROOFING CHECKOFF SHEET, Retl 'rn to Blair City HMI prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would Mt Interfere with reroofing work, please Indicate compliance with the following requirements fQL[owing thin reroofing Job. Property Address:, :Z2 5-K -- Contractor or Homeowner (if self) : „ �- ckr Permit . M - 20 - ' 6 j Installation Date- YES ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (1907.1) ❑ ICI= PRQTECTIaN IN §TALLEC An ice barrier that consists of at least two layers of undsrla►yment or of a self-adhering polymdr modified bitumen sheet was installed and extends at lea -1 from the eave's . a - edge , to a point at least 24 In Irwside the exterior wall line of the building. (11905,2.7.1) ❑ STfit1gTU_ AL COMP9NOTS ARE SOUND: The structural'roof components are apable of supporting the roof covering system and the material and equipment loads that will be enwuntared during installation of the roof covering' system, (8907.2) ❑ EXISTING COP-RING WAS RgMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 _ .. DQ NOT tISgZUATED iltli_TAL tJR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter -flashing were reinstalled If rusted. (R907.5) ® FLASHING IN§IA LLED PROPER ; dashing shall be reconstructed in accordance with approved manufacturer's Installation instructions. !Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation, (8907.0) Sign ur rimary Ins Her bate Signature en Holder Date