871l.tif F
O
October 17, 2014
Sel NE b 8p08
glair
. NIS -2 � 4 - 00871
permit Nu d n ew s iding
FwO °f an
perm perm
SS . 700 N A 5th St
mit has passed inspection, but
Contractor Bove referenced por th permit. A signed Roo g
Dear ion f the a been turned in all work was performed in
Inspe as b that
The R heckO Sheet h as certification
o R C et is require 1 r c onvenien
1 ding Code. .Please complete
Checkoff Sheet
the nclosed for 20p9 BU
YO by
fax
e st rmdamage q��i-blair.ne.us),
accordant et is•t by email
ck She E, 88008) .
lank R at X a nd retur I St, Blair, N
b 2A $ 16th
A rm immed� mail � S Sheet within 60 days of the d
the fo 4 �g5) or by Checkoff p ermit an
402 . 426 ' leted Roofing e osit associated w►th this p Attorney to
comp 50.00 d p Board and City
do not re turn a � the � o f glair Licensing
,OU e Ou will forf o�tthe City tion.
,; no tic e, y ove rt istra
this issue our cont ractor rig lease call the Blair
Ispe ndingy Checkoff Sheet p
e Roofing
about .091.
, nt at
,est�ons
co opera tion in this matter.
r your
Nebraska 68008. 402 -426 -4141
® Fax 402 - 426 -4195 • E-rYiai� cityofbtair @ci,blair,ne,us