Checkoff Sheet MS-2014-00629_0001.tif i
I
INTERNATIONAL RESIDENTI CODE
CiTY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: _ AZ S 2 o ZLl 00 `
i
Installation Date: C 1 1 d �'
. i
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
i
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
owl i
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
a
0 f �(
"
Sig re o
natuf Primary Installer Date
Date
Signature of Permit Holder
I