Loading...
Checkoff Sheet MS-2014-00628_0001.tif i i INTERNATIONAL I N CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Half prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would I not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: 'S D1 Ott %r Installation Date: YES NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION CNSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ' Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted, (R907.5) i FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance i with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) I Signature of Primary Installer Date Date Signature of Permit Holder