Checkoff Sheet MS-2014-00440_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHEC KOFF SHEET
Return to Blair city Hall prior to Final Inspection j
218 S 16 street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: 0l 00
Installation Date:
YES NO
Q The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
,[ [� STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
Q NO RUSTED METAL OR Existing vent flashing, metal edges, drain
FLASHING:
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
d � � e"f
igna ure of Primary Installer
Date j
I
Signature of Permit Holder Date