Checkoff Sheet MS-2014-02616_0001 (2).tif I
ERD 402 - 861 -0002 p.3
2009 INTERNATIONAL RESIDENTIAL O
CITY OF BL AIR REROOFING CHECKOFF' SHEET _
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followings this-reroofing job. --�
Propdrty Address:
Contractor or Homeowner (if seI
Permit #: MS -201 MIS_ 7 0 26
i
Installation Date:
ES NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
❑ ICE PROTECTION INSTALLED An ice harrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (1905.2.7.1)
❑ STRUCTURAL COMPONENTS ARE -SOUND . The The structural'roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. '(R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
❑ DID NO T USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5)
�} ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed priorto installation. (11907.6)
f�
i t im In Vier bate
ign of Pe is r ate