Loading...
Checkoff Sheet MS-2014-02616_0001 (2).tif I ERD 402 - 861 -0002 p.3 2009 INTERNATIONAL RESIDENTIAL O CITY OF BL AIR REROOFING CHECKOFF' SHEET _ Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followings this-reroofing job. --� Propdrty Address: Contractor or Homeowner (if seI Permit #: MS -201 MIS_ 7 0 26 i Installation Date: ES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ❑ ICE PROTECTION INSTALLED An ice harrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (1905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE -SOUND . The The structural'roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. '(R907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 ❑ DID NO T USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907,5) �} ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed In accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed priorto installation. (11907.6) f� i t im In Vier bate ign of Pe is r ate