Loading...
Checkoff Sheet MS-2014-01989_0001.tif f Triton LLClrritonExterior 4028615500 p.13 I NAL RESID ODE �a INTERNATIO CITY OF BLAIR. REROOFING CHEC KOFF SHEET Return to Blair City Hail prior to Final inspection M S '1e Street, Blair, NE 68Q0 sed byt Because of limitations cau the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the f requiremen ' foilowin this reroofing Soh. Permit: i Installation Date: YES lath [?r The materials and methods of application use re covering or building cage. r {R907 the ex isting roof covering Comply with the requirements o Q ICE PROTECTION INST her Apo` Y mer ied bitumen heetwaslled and urideriayment or of a self adhe ' ring p aint a #le as# 24 inches inside the extertor extends at least from the�� �} to a p wail line of the building. ( �' STRUCTURAL CbMPONENTS ARE so ND: The structural roof components are capable of supporting the roof covering installation of he roof c ve ing system. (R90.2) 7 loads that will be encountered during EXISTING G�VERi1dG WAS REMo\[ED. r Existing roof covering was removed far one Ef of the reasons required by section R907.3 (� (� NO RUSTED ME�'A!. OR FLASH E xistin g of vent reinstalled c if Busted edges, {R907 5) drain ou #lets, collars or metal counter ashin g Were I be recons accordance L ructed in 0 FLA.SHiI�IG INSTALLED PRraP ai a 'ton instructions. ctions' Metal flashing o which with approved manufacturer bituminous materials are to be adhered shall be primed prior to installation. (11907- Date Signature of Primary Installer /0 Da Signature