Checkoff Sheet MS-2014-01989_0001.tif f
Triton LLClrritonExterior 4028615500 p.13
I
NAL RESID ODE
�a INTERNATIO
CITY OF BLAIR. REROOFING CHEC KOFF SHEET
Return to Blair City Hail prior to Final inspection
M S '1e Street, Blair, NE 68Q0
sed byt
Because of limitations cau
the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the f requiremen '
foilowin this reroofing Soh.
Permit:
i
Installation Date:
YES lath
[?r The materials and methods of application use re covering or
building cage. r {R907 the ex isting
roof covering Comply with the requirements o
Q
ICE PROTECTION INST
her Apo` Y mer ied bitumen heetwaslled and
urideriayment or of a self adhe ' ring p aint a #le as# 24 inches inside the extertor
extends at least from the�� �} to a p
wail line of the building. (
�' STRUCTURAL CbMPONENTS ARE so ND: The structural roof components are
capable of supporting the roof covering installation of he roof c ve ing system. (R90.2) 7 loads
that will be encountered during
EXISTING G�VERi1dG WAS REMo\[ED. r Existing roof covering was removed far one
Ef
of the reasons required by section R907.3
(� (� NO RUSTED ME�'A!. OR FLASH E xistin g of vent reinstalled c if Busted edges, {R907 5) drain
ou #lets, collars or metal counter ashin g Were
I be recons
accordance
L ructed in 0 FLA.SHiI�IG INSTALLED PRraP ai a 'ton instructions. ctions' Metal flashing o which
with approved manufacturer
bituminous materials are to be adhered shall be primed prior to installation. (11907-
Date Signature of Primary Installer
/0
Da
Signature