Loading...
Checkoff Sheet MS-2014-01988_0001.tif i Triton L LC/Trito n Exte rio r 4028615500 p.11 009 I NT ERNATIONAL ESIDEN IAA, CODE � CHECKOFF CITY OF BLAIR FRET OOFIN© t Final lnspeotion Return to 8iair City Halt prrx 218S i6th Street, Blair, NE 68888 because of limitations caused by th e ind c corrPipl4ar't d etal l ed requireme . not interfere with reroofing work, please folk winc 1, this reroofing job. Permit 9: ( � Installation Date. i YES NO 1' The materials and methods of applicon used far recovering or replacing the existing ati roof covering comply with the requirements of the building code, (R907.1) [ l� ICE PROTECTION INSTALLED: An ice barrier than consists Of at least two layers of wa j al mer modified bitumen sheet s installed and underlaymenf or of a self-adhering p y extends at least Pram the eave's ed e to a paint at [east 24 inches inside the exterior wall line of the building. (R905 "2.7.1) [ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting The roof covering system and the materisl and equipment [pads ,. that will be encountered during Installation of the roof covering system. (RG07.2) (� r5XISTING COVER%gn WAS p,5MOVED. E)[st[ng roof covering was removed for one of the reasons required by section 8907.3 ND RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) L FLAB 41MG INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation hall be pruned prior to ins tallation. bituminous materials are to be adhe (8907.6) j Signature of Primary Installer Date r� � Signature of Permit Haider Daf i