Loading...
Checkoff Sheet MS-2014-01985_0001.tif Triton LLClrritonExterior 4028615500 p.14 RN/"1� A IONAL RESIDENTIAL IAA CQ 2009 INTO, CHECKOFF SHEET CITY OF �3�.�1.IR R'�RQQ�` Q Final inspection . Return to Biair city Hall 'Prior 2`18 S 16th Street., Blair, NE 68008 Because of limitations caused by the in f e asibility to'perform ind icate compliance requ remenfsd ctions which not interfere with reroofing work, pleas f this raroof1ng job. Permit #: installation late: �- YES No C3 The materials and methods of application used for recovering or replacing the eis #ing roof covering comply with the requirements of the building code. (8907.1) cons of at [ [CE PROiTEC3 [ON 1NSTALLI =D: Ana; mer modified bitumen sheet wasinsta�led, and underlayrnent or of a self - adhering p Y extends m l e a s t o from the eaves ed to a point at least 24 inches inside the e�cferior wall line of the building. (8905.2. STRUCTURAL Ct7MP ONENTS ARE SOUND: The structural roar components are capable of supporting the roof co of henaa� ov ing systema(R907 ) loads that will be encountered during 'installation ET C3 EXlSTiNG CClVERii+IG WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAi, ©R FLASH NG: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) C3 FL.AS! INSTALLED PROP LY, installation Flashing sans. l ere flashing o in a with approved manufacturer bituminous materials are to be adhered shall be primed prior to installation. (R907. Date Signature of Primary Installer 0 D e Signature Permit Holder I I