Checkoff Sheet MS-2014-01984_0001.tif i
i
Triton LLC/Triton Exterior 4028615500 p,18
ONA RESIDENTIAL 0DE-
��Q I '
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair city Hall prior to Final Inspect
218 S 16 Street, Blair, NE 68008 ich
Would
Because of limifiations caused by the infeasibility to'perfar d W ith led In f re menus
not interfere with reroofing work, please indicate complian
followin this reroofing job.
Permit#:
Installation Date;R
YES NO
The materials anti methods of application used for recovering or replacing the existing
roof covering complY with the requirements of the building coda, (8907.1)
I
ICE 1'RD'fl~CTION INSTALLED: An icebar f modified bitumen sheetwas�installed a d
underlay
man t or of a self-adhering polymer
extends at least from the eave's edge to a point at [east 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
[a" [l STRUCTURAL COMPONENTS ARE soUND: The structural roof components are
e of supporting the roof covering system and the materiai and equipment loads
capabl
capabl be encountered during installatiori of the roof covering system. (R907.2)
® EXISTING COVERfi n WAS REMOVED: Existing roof covering was removed for one
Of the reasons required by section R907.0
[� N4 RUSTED Ml~`CA1r OR PL,ASHiNG Exisre not reinstalled find cif metal edges, rusted (8907.5 }
o collars or metal counter flashing w
(� l LASHING INsTALL.ED PROPERLY; Flashing
ins tions. Metal flashing 'to which ardance
with approved manufacturers installation r
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of E'rimarY Installer
Date
10 r
ermit Hold r p
Signature ofs �'