Loading...
Checkoff Sheet MS-2014-01984_0001.tif i i Triton LLC/Triton Exterior 4028615500 p,18 ONA RESIDENTIAL 0DE- ��Q I ' CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair city Hall prior to Final Inspect 218 S 16 Street, Blair, NE 68008 ich Would Because of limifiations caused by the infeasibility to'perfar d W ith led In f re menus not interfere with reroofing work, please indicate complian followin this reroofing job. Permit#: Installation Date;R YES NO The materials anti methods of application used for recovering or replacing the existing roof covering complY with the requirements of the building coda, (8907.1) I ICE 1'RD'fl~CTION INSTALLED: An icebar f modified bitumen sheetwas�installed a d underlay man t or of a self-adhering polymer extends at least from the eave's edge to a point at [east 24 inches inside the exterior wall line of the building. (8905.2.7.1) [a" [l STRUCTURAL COMPONENTS ARE soUND: The structural roof components are e of supporting the roof covering system and the materiai and equipment loads capabl capabl be encountered during installatiori of the roof covering system. (R907.2) ® EXISTING COVERfi n WAS REMOVED: Existing roof covering was removed for one Of the reasons required by section R907.0 [� N4 RUSTED Ml~`CA1r OR PL,ASHiNG Exisre not reinstalled find cif metal edges, rusted (8907.5 } o collars or metal counter flashing w (� l LASHING INsTALL.ED PROPERLY; Flashing ins tions. Metal flashing 'to which ardance with approved manufacturers installation r bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of E'rimarY Installer Date 10 r ermit Hold r p Signature ofs �'