Loading...
Checkoff Sheet MS-2014-01983_0001.tif i Triton LLCrfritonExterior 4028615500 P.19 I RESI U+�3 TIAL DOD CITY OF BLAIR REROOFING CHECK SHEET Return to Blair city Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations Doused by the infeasibility campy d etai l ed ifnllnwing requirements d not interfere with reroofing work, please ind following this reroofing job, Permit #: Q!� installation Date: YES No s of application used for recovering or replacing the existing The materials and method roof covering comply with the requirements of the building code. (R007A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of aself- adhering polymer modified bitumen sheet was installed and extends at least from the eavels edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SaUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) �' EISTiNG GOVERiI�G �NAS REMOVED: Existing roof covering was removed for one ' of the reasons required by section RJ47.3 �; NO IUSTE© METAIw OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHl(�LG 1N5TALtED t'ROPEI 1-Y: Flashing {ructions] Metal flashing to Which ordan with approved manufacturers installation in bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer Date at Signature o Permit Holder i