Loading...
Checkoff Sheet MS-2014-01774_0001.tif I I 2UUV INTERNATIONAL, RESIDENTIAL CODE MY" G, , kOFF SHE F,-T, 0F.SLAOR RERO G'CHE PFI"N," etulrn o h air �IIt s l� or to inaI p etsad ion 218 S 8 Street, Blair, NE 88008 Because of limitations caused,by.the infeasibility to. perform detailed inspections which would not interfere with reroofing work 'piIease indicate compliance with the following` requirements following thls� reroofing job, Property Ad die ss » `fe T� Contrector or Homeowner (if self) ,: Permit #, MS-2014-1 I v _ Insta I Iatioln Date. - YE6 Na ❑ '' he Materials and methods of,application used.fer recover €ng o replacing the : existing roof covering comply with the regtu rements 6 the b I ding code. `(11907.1) ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlaymentor of a self-adhering polymer modified; bitumen sheet was installed and extends zt Ieast from the eave's edge to a point at least 24 Inches inside the exterior wall line of.the building. (R906.2.7.1) ❑ stPUd�TURAL COMP4N15 TS ;ARE SOUND: The structural'roof components are capable of supporting the.roof covering, system and the material and equipment loads that will be ericouhtered d installation of the roof covering system, (R907.2) EXISTING COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section 8907,3 DID NOT USE RUSTED METAL. 011 FLASHING. EkIstincg vent flashing' metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R007.5) ❑ FL.ASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 4 T / � Signa ure of Primary Installer Date Si ature of Permit Holder Date