Loading...
Checkoff Sheet MS-2014-01651_0001.tif i 2`00191NTERNATIONAL RES,IDENTIALCOPE I I Return to ' lay Ci y arl' prior t© Final lnspecf on 218 S 16 # " Street, lair, NE 68408 Because of limitations caused by the infeasibility to perifarrn detailed inspections which would no interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. 'r tv Property Address; c ' Contractor or Homeowner (if self - Permit #: MS-2014- a Installation Date , YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of self - adhering polymer modified bitumen sheet was installed and extends at least from the egue's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2:7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering, system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING „ COVERING..WAS REMOVED; Existing roof covering vtias,removed for one of the r6'es'ons,required byl.section,R907i3 DID NOT USE RUSTED METAL OR FLASHING Existing vent flashing, metal edges, drain outlets, coil ” vr`m'etal counter = flashing were riot reinstalled if rusted. {R907.5} FL,A$.E N'6 INSTALLED PRaPERLY: Flashing shall be reconstructed' in accordance with approved manufacturer`s installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sign Lure of Primary Installer Date Signature of Perrnit Holder Date