Checkoff Sheet MS-2014-01061_0001.tif i
i
i
T
i
2009 INTERINATI0NAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection
218 S 16 Street, Blair, NE 68008
Because of thnitations caused by the infeasibility to perform defy €led inspections which would
notirderfere with reroofing work, pteaso Indicate compliance with the following requirements
following this-reroofing lob,
Property Address
Contractor Or Homeowner t (if sel :: L ')
Permit #: MS- 2014 - .��'
Installation Date;"
YE i
NO
❑ The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R9071)
i E
` ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
l� undsrlaymento off a self-adhedrig polymer modified bitumen sheet was installed and
Mends at leastfrom the eave's edge to a point at least24 inches inside the exterior
wail line of the building. (11805.2.7.1)
\LA ❑ SSRU6ft) RALCOMPONEMARE SOUND. The struetura€roof components are
�— oapablegfsUpportngthexoof covering system and the material and equ €pmentloads
that be'encoynfered during installation ofthe roof covering system. (R907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
` of the reasons required by section 8907.3
❑ DII}NOTUSE RUSTBDME7AL DR FLASHING; Existing vent flashing, metal edges,
drain outlets, collars or meta€ counter- flashing were not reinstalled if rusted. (R907.5)
❑ . FLASHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
wit}tapproved manufacturers installation instructions; Metal flashing to which
bituminous materials are to be adhered shall be primed prior to instillation. (8907,6)
ignatur of P " sty Install a
Lf of /
a Ire O P tE�O ar / �j �� )"f�,' ate -
hays ljo �oayo :13efgnS
96lawed uaaolS bLOZ :ol pa ;sod
hays ljo �oayo :uoijeSaanuoO
NV Zb :LL 17LOZ `17L aagolop `Aepsenl W pa ;Sod
[uaoo @ll00sApuea �OuayoS ApueH :Luoad
a!�18
I
i