Loading...
Checkoff Sheet MS-2014-00963_0001.tif i Triton LLCrfritonExterior 4028615500 p.17 0 jj� RESIDENTIAL IAL CODE V6►� INTER NATIONAL � C�EC���[^' ��E� cI°�`�' OF FLAIR REROOFI Final inspection Returr�t to Biails* �� S Hair p rior NE 88848 218 S 'i 6 Because of limitations causad by the infeasibility tQ'perform detailed inspections which would not interfere with reroofing work, p lease indicate compliance with the following requirements fouqwiM this reroofing job. Permit #: 1natailation Date: �- -- YES RO 0 C3 The materials and methods of appli ement o f fo r rec e l- de, tePl 07 ,the exis 1 roof covering comply with the requir ICE PROTECTION INSTALLED: An ice barrier that consists fat leas a tw sta layers led and of er modifled Witumen �--- undarlayment or of a self�adhering P ym extends at least from the egyg' � � e to a point at least 24 inches inside the e error wall tine of The bWlding. (R9O5.2 ) L�' ( SiR GTURAL. COMPONENTS ARE SQCTND: The material and q ipm nt loads capable of supporting the roof covering system and she he 8947.2) stem. that will be encountered during installation of the roof covering system. ( [3 CoVERlNC WAS REIVEUVE17: Existing roof covering was remo ved for one of the reasons required by s6cfiion 8907.3 KI C3 N RliSTED META! OR FL ASH a l shin F t flashing Metal edges, were 9 of r instaft d it rusted(R907. n outlets, collars or meal counter g INSTALLED PROPERLY: Flashing shall be reconstruca FLASHII�IG d in accordance w ith approvad manufactut b i adherred shall ba primed prior to installation. (R9O7. bituminous materials are �o b Date Signature of Primary Installer #/D to Signature f pe it Hot er i i i i