Checkoff Sheet MS-2014-00963_0001.tif i
Triton LLCrfritonExterior 4028615500 p.17
0
jj� RESIDENTIAL IAL CODE
V6►� INTER NATIONAL � C�EC���[^' ��E�
cI°�`�' OF FLAIR REROOFI
Final inspection
Returr�t to Biails* �� S Hair p rior
NE 88848
218 S 'i 6
Because of limitations causad by the infeasibility tQ'perform detailed inspections which would
not interfere with reroofing work, p lease indicate compliance with the following requirements
fouqwiM this reroofing job.
Permit #:
1natailation Date: �- --
YES RO 0
C3 The materials and methods of appli ement o f fo r rec e l- de, tePl 07 ,the exis 1
roof covering comply with the requir
ICE PROTECTION INSTALLED: An ice barrier that consists fat leas a tw sta layers led and
of er modifled Witumen �---
undarlayment or of a self�adhering P ym
extends at least from the egyg' � � e to a point at least 24 inches inside the e error
wall tine of The bWlding. (R9O5.2 )
L�' ( SiR GTURAL.
COMPONENTS ARE SQCTND: The material and q ipm nt loads
capable of supporting the roof covering system and she he 8947.2)
stem.
that will be encountered during installation of the roof covering system. (
[3 CoVERlNC WAS REIVEUVE17: Existing roof covering was remo ved for one
of the reasons required by s6cfiion 8907.3
KI C3 N RliSTED META! OR FL ASH a l shin F t flashing Metal edges,
were 9 of r instaft d it rusted(R907. n
outlets, collars or meal counter g
INSTALLED PROPERLY: Flashing shall be reconstruca
FLASHII�IG d in accordance
w ith approvad manufactut b i adherred shall ba primed prior to installation. (R9O7.
bituminous materials are �o b
Date
Signature of Primary Installer
#/D to Signature f pe it Hot er
i
i
i
i